Ace Junior's Air Assault Phase II 2026 – Soar to Success with This Power-Packed Practice Test!

Session length

1 / 20

What form is required to record a sling load inspection, and how many times will it be recorded?

DA Form 7382, 2 times

DA Form 7382, 1 time

DA Form 7382, 4 times

DA Form 7382, 3 times

In sling load operations, you document each inspection on a standard form so every safety check is recorded as the load moves through the rigging process. The form used is DA Form 7382, the Sling Load Inspection. It’s filled three times because there are three critical inspection points: the initial rigging/pre-load check, the check just after hook-up and before lift, and the final check after the load is secured and ready to move. Recording all three stages on the same form provides a complete safety record of the load's configuration and status throughout the operation.

Next Question
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy